15, 30, & 60 cfm Compact Dryers Chapter 3: Installation 25 of 57
Shutting Down the Dryer
1. When processing is complete, close the hopper slide gate and shut down any in-line
companion equipment, such as the aftercooler.
2. Turn the Dryer ON/OFF power switch to OFF.
3. Turn the system ON/OFF switch to OFF.
4. If needed, empty the drying hopper.
5. For maintenance or a long term shutdown, open (de-energize) the electrical
disconnects at the dryer and at the power drop.
Comentarios a estos manuales